Skip to content
Job boardOpen

Data Center Construction Manager

Confidential · London, United Kingdom · On-site · SENIOR

  • London, United Kingdom · On-site
  • English

Indexed (today) · refreshed constantly

Start
flexible
Work mode
On-site
Contract
Freelance / B2B
Seniority
SENIOR
Reference
CR/511196

Required skills

Nice to have:Data Centre ConstructionSecurity Site Management

Languages: English

Job description

Project overview

Linnk Group is currently recruiting for an experienced Data Centre Construction Manager to support a major hyperscale data centre programme in the Greater London region.

This is a minimum 12-month contract, with strong potential for extension, starting in January 2027. The role will be fully site-based, 5 days per week, and will involve overseeing Principal Contractors, managing construction delivery, programme, risk and stakeholder interfaces on behalf of the client.

We are looking for an experienced client-side Construction Manager with a strong UK construction background, ideally within data centres, mission-critical infrastructure.

Employment type: Contract

Requirements

-CSCS Card — Black (Manager level) or equivalent valid card

-SMSTS (Site Management Safety Training Scheme) — current and valid

-NEBOSH Construction Certificate (or equivalent, e.g., NVQ Level 6 in Construction Site Management)

-CDM 2015 Regulations — demonstrable working knowledge and experience as a Client representative or Principal Contractor’s agent

Essential Compliance & Administrative:

-Right to work in the UK.

-Ability to travel to/between sites.

Project details

12 months (extendable)

Rota schedule: Full Time on Site 40 hours a week

Mobilization date(s): 4th Janurary 2027

Accommodation: Construction cabin, desk, chair and connections (Wi-Fi/ electricity etc.) + common area toilets, kitchen etc.

Experience & Skills:

-Minimum 8 years’ experience in UK construction management, with at least 5 years in a senior site-based CM role

-Oversight of Principal Contractors — proven track record managing large Tier 1/Tier 2 contractors and multiple sub-contractor packages simultaneously.

-CDM Client-side duties — experience acting on behalf of a Client under CDM 2015, including reviewing Construction Phase Plans, ensuring welfare provision, and managing Principal Designer/Principal Contractor interfaces.

-Brownfield site experience — managing contaminated land, asbestos in made ground, high water table conditions, and associated risk controls.

-Stakeholder & consent management — experience liaising with statutory bodies (Thames Water, Network Rail, Local Planning Authorities) and managing third-party obligations/approvals.

-Programme management — ability to critically assess and manage contractor programmes (Primavera P6 or MS Project), track milestones, and report on progress/delay.

-Risk management — proactive identification, assessment, and communication of project risks, including EOT/delay event management.

-Client reporting — experience producing clear, concise progress reports, risk registers, and status updates for senior/executive stakeholders within [large multinational] organisations.

-Self-starter — ability to work independently on site with minimal supervision, driving day-to-day project delivery autonomously.

-Communication skills — excellent written and verbal communication; comfortable presenting to and challenging senior stakeholders.

-Data centre construction — experience on hyperscale or colocation data centre projects (shell & core, campus-level infrastructure) is highly desirable but not essential.

-Working for a large multinational technology client (e.g., AWS, Google, Microsoft, Meta) or similar blue-chip client-side role.

-Security-sensitive environments — experience managing works on sites with enhanced security requirements (CCTV, access control, perimeter security).

  • Start: flexible
  • Remote: onsite
  • Location: London, GB
  • Languages: English

Indexed by 9am's meta-search. You are a job provider? Claim or manage this listing

Found on linnk.com

  1. RandstadNew

    Agent

    Confidential· Feltham, Greater London, United Kingdom· On-site· SENIOR· £63–65 / h

    • Site Management
    • Subcontractor Management
    • Reinforced Concrete
    • +8

  2. Job boardNew

    Project Delivery Manager

    Confidential· Slough, Berkshire, United Kingdom· On-site· Senior· £50–75 / h

    • Contractor Management
    • Programme Management
    • Construction Project Management

Browse all jobs
Sign up free to apply