Skip to content
Job boardOpen

IPC Commissioning Planning Engineer

Confidential · London, United Kingdom · Hybrid · Senior

  • London, United Kingdom · Hybrid

Indexed (3 weeks ago) · refreshed constantly

Start
flexible
Work mode
Hybrid
Contract
Freelance / B2B
Seniority
Senior
Reference
CR/356951_1791300545

Job description

Project overview

IPC Commissioning Planning Engineer

Contract Type: Contract

We are recruiting for an IPC Commissioning Planning Engineer to join the Central Controls Team supporting the Hinkley Point C Project as it moves into the commissioning phase.

Working within the Planning discipline of Integrated Project Controls (IPC), you will support the management and maintenance of the Level 2/4 Integrated Work Schedule (IWS), ensuring alignment with Level 3 contract schedules and providing high-quality schedule data, analysis and reporting.

The role will support informed decision-making and the effective, timely delivery of work across this major infrastructure project.

Responsibilities

What We're Looking For:

Desirable experience includes:

  • Produce and maintain the Integrated Work Schedule in Primavera P6, developing fully logic-linked work plans aligned with Work Breakdown Structures (WBS).
  • Ensure Level 2/4 schedules are maintained and updated within agreed reporting timescales.
  • Support the IPC Lead Planner and IPC Planning Manager with project planning and controls activities.
  • Align Level 3 contract schedules with the overall Integrated Work Schedule.
  • Identify, analyse and provide solutions to schedule and time-related issues.
  • Support Trend & Change processes and provide analysis of project risks and opportunities.
  • Produce project-level schedule reports, including commentary on key schedule drivers and performance issues.
  • Provide intelligent planning information and analysis to support Senior Project and Programme Managers.
  • Work closely with Cost, Risk, Estimating, Performance Analysis and other Project Controls disciplines.
  • Ensure planning information is aligned across the wider Integrated Project Controls function.
  • Manage schedule changes and help resolve planning issues with key stakeholders.
  • Ensure compliance with project governance, scheduling standards and procedures.
  • Support continuous improvement and best practice across the Planning discipline.
  • Strong understanding of scheduling methodologies and techniques.
  • Excellent working knowledge of Primavera P6.
  • Experience producing accurate and fully logic-linked project/construction schedules.
  • Strong understanding of engineering, procurement and construction methods.
  • Previous experience within Project Controls or Project Management on a major construction or infrastructure project.
  • Understanding of Earned Value Management/Analysis (EVM/EVA).
  • Knowledge of Cost, Estimating and Risk disciplines within Project Controls.
  • Understanding of commercial contracts, particularly NEC and FIDIC.
  • Knowledge of schedule risk analysis techniques.
  • Strong analytical and numerical skills with excellent attention to detail.
  • Good commercial awareness.
  • Strong stakeholder management, written communication and verbal communication skills.
  • Nuclear sector experience.
  • Experience on major infrastructure programmes.
  • EcoSys and Earned Value Management.
  • ARM or similar risk management tools.
  • Synchro 4D modelling.
  • Acumen Fuse schedule analysis.
  • Power BI.
  • SAP.
  • CEMAR.
  • Safran / QSRA.
  • Experience presenting complex project information to senior stakeholders.

Requirements

  • Degree in Engineering, Construction or a related discipline, OR HND/equivalent supported by appropriate industry experience.
  • Chartered or equivalent professional status.
  • Proven experience in a Project Management or Project Controls environment in a similar scheduling/planning role.
  • Major construction project experience.
  • Substantial experience using scheduling software, ideally Primavera P6 version 7 or above.
  • Commercial contracting experience.
  • Experience working with integrated project schedules and complex project controls environments.

Project details

Ongoing

Bristol, SDC or Hinkley Point C (HPC) - minimum 3 days per week on site/office

£390 PAYE / up to £530 Umbrella

Start Date: 7 December 2026

Background Checks: BPSS - strict random drug and alcohol testing policy applies

Hours: 37.5 hours per week, 5 x 7.5-hour days. Core hours 9am-3pm

  • Start: flexible
  • Location: London, GB

Source notes

This contract vacancy is being advertised by Rullion Ltd.

Since 1978, Rullion has been securing exceptional candidates for a range of clients; from large well-known brands to SMEs and start-ups.

As a family-owned business, Rullion's approach is credible and honest, focused on building long-lasting relationships with both clients and candidates.

Rullion is a forward-thinking recruitment company that specialises in providing a wide range of talent consultancy services to a diverse client base; from small start-ups to large household names.

We celebrate and support diversity and are committed to ensuring equal opportunities for both employees and applicants.

INDENG-MW

Rullion celebrates and supports diversity and is committed to ensuring equal opportunities for both employees and applicants.

Indexed by 9am's meta-search. You are a job provider? Claim or manage this listing

Found on rullion.co.uk

Browse all jobs
Sign up free to apply