Required skills
- Wind Turbine Pre-Commissioning
- SCADA
- Hydraulics
- Pitch Systems
- Electrical Safety
- Lockout/Tagout
- GWO Basic Safety Training
- GWO Lift User
- OGUK Offshore Medical
- Chester Step Test
- Electrical Safety for Qualified Electrical Persons (ESQ)
- CSCS Card
Languages: English
Job description
Project overview
Job Title: Pre-Commissioning Supervisor - Offshore Wind
Project details
Dundee, United Kingdom (Port / Quayside Marshalling)
1 January 2027 - 31 December 2027 (12 Months)
Contract Type: Contract - Inside IR35
Positions Available: 4
About the Role
We are seeking four experienced Pre-Commissioning Supervisors to join a major UK offshore wind campaign operating out of Dundee. You will play a pivotal role in the quayside pre-commissioning of next-generation 15MW-class wind turbine nacelles and hubs using a Nacelle Power Unit (NPU), ensuring every unit is safely energised, tested, and verified prior to offshore installation.
What You Will Be Doing
What We Are Looking For
Randstad CPE values diversity and promotes equality. No terminology in this advert is intended to discriminate against any of the protected characteristics that fall under the Equality Act 2010. We encourage and welcome applications from all sections of society and are more than happy to discuss reasonable adjustments and/or additional arrangements as required to support your application.
Candidates must be eligible to live and work in the UK.
For the purposes of the Conduct Regulations 2003, when advertising permanent vacancies we are acting as an Employment Agency, and when advertising temporary/contract vacancies we are acting as an Employment Business.
skills
delivery of installations
education
first aid
- Oversee and execute pre-commissioning activities on wind turbine nacelles and hubs prior to offshore load-out.
- Manage safe energisation using the Nacelle Power Unit (NPU), including cable routing, connection, yaw stop installation, and LOTO Level 2 procedures.
- Conduct thorough visual and functional inspections of nacelle and hub control cabinets, cooling, lubrication, hydraulic, and pitch systems.
- Commission internal network switches, upload turbine-specific software/parameters, and perform SCADA verification.
- Test safety-critical systems including emergency stops, smoke/arc detection, hydraulic accumulators, and backup power.
- Operate the generator in motor mode across specified RPMs to monitor alarms, temperatures, lubrication, and cooling performance.
- Enforce strict HSE standards, exclusion zones, and site compliance throughout all phases before safely de-energising and preparing units for transport.
- Proven supervisory or lead technician experience in wind turbine pre-commissioning, commissioning, or HV/LV electrical & mechanical testing (experience on large-scale 15MW-class offshore turbines is highly advantageous).
- Strong working knowledge of electrical safety, Lockout/Tagout Level 2 (LOTO 2), hydraulics, pitch systems, and SCADA interfaces.
- Valid GWO Basic Safety Training (Working at Heights, Manual Handling, Fire Awareness, First Aid) and GWO Lift User.
- Valid OGUK (OEUK) Offshore Medical & Chester Step Test.
- Electrical Safety for Qualified Electrical Persons (ESQ) & OEM Low Voltage Electrical Awareness Training (or eligibility/willingness to complete platform-specific NPU/TPU onboarding).
- UK site safety compliance (CCNSG Safety Passport / CSCS Card & CITB test subject to final site HSE confirmation).
- Start: flexible
- Location: Dundee, Dundee, GB
- Rate: 63-100 EUR/h
- Languages: English
Indexed by 9am's meta-search. You are a job provider? Claim or manage this listing
Found on Randstad UK