Skip to content
Job boardOpen

Site Designer and Construction Manager for Project Innozhero

Original title: Markprojektör och byggledning till projekt Innozhero

Ework Group Sweden · Helsingborg, Sweden · On-site · SENIOR

  • Helsingborg, Sweden · On-site
  • Swedish · English

Indexed (yesterday) · refreshed constantly

Start
14 December 2026
Work mode
On-site
Contract
Freelance / B2B
Seniority
SENIOR
Reference
JR-56398

Required skills

Nice to have:Industrial Project ExperienceNSR Filborna Waste Management Area Experience

Languages: Swedish · English

Job description

Seeking a senior Site Designer and Construction Manager for the Innozhero project, a large-scale Carbon Capture and Storage (CCS) initiative. The role involves supporting site design, drainage, water and sewer systems, and managing groundworks contracts.

Project overview

For our client Öresundskraft, we are looking for a senior Site Designer and Construction Manager for the Innozhero project.

Innozhero is the project name for Öresundskraft's large-scale investment in CCS

Filbornaverket produces district heating and electricity through energy recovery from residual waste.

The CCS investment will significantly reduce both fossil and biogenic carbon dioxide emissions from the operation. When carbon dioxide of biogenic origin is captured and permanently stored, negative emissions are created. These can be certified and sold to companies as a way to manage residual emissions that are difficult to reduce by other means. In this way, negative emissions can complement companies' own emission reductions.

Innozhero covers the entire chain from capture to permanent geological storage. Linde Engineering is building the capture plant at Filbornaverket. The captured carbon dioxide will be transported to Halmstad harbor, where Linde is responsible for intermediate storage. Thereafter, Northern Lights is responsible for sea transport and permanent geological storage approximately 2,600 m below the seabed in the North Sea off Bergen, Norway. The Final Investment Decision, FID, was made on September 30, 2026. The project is thus moving from planning to execution.

The construction process will begin at the end of 2026, and the plant is planned to be operational in 2029.

The Assignment

Öresundskraft will strengthen the project organization in the following areas:

The consultant will work part-time on the project with varying workload depending on the project phase.

The consultant must be able to provide expertise in the following areas:

If not all tasks can be covered by one person, the consulting company can offer several. This should be done in such a way that one person is the main consultant. The main consultant must have broad knowledge in the design of stormwater and water and sewer systems and perform the majority of the work. Some of the design work can be performed by more junior resources under the leadership of the main consultant. Specific support from other consultants can then be provided for areas where the main consultant needs professional support, such as construction management.

The organization and work distribution must then be described in the tender.

Example of tasks

Linde Engineering is designing the carbon capture plant to be erected within an area where Öresundskraft has existing infrastructure in the form of traffic areas, district heating pipes, stormwater pipes, water and sewer pipes, as well as underground pipes for electricity and fiber optic cables.

The existing infrastructure needs to be partially relocated to enable the establishment of the plant. The consultant shall assist Öresundskraft in reviewing and assessing the alternative utility and infrastructure routing proposed by Linde Engineering, with regard to technical feasibility, operational reliability, future maintenance, and impact on existing operations.

The assignment may also include detailed design of the relocation and reconstruction of stormwater facilities, water and sewer pipes, and underground pipe systems for electricity and fiber optic cables. The consultant shall, as needed, prepare the necessary construction documents, technical descriptions, and quantity lists.

Öresundskraft is also responsible for providing areas adjacent to Filbornaverket for contractor site offices, parking, and temporary storage areas during the construction period. The consultant shall prepare construction documents for the measures required to enable these establishment areas, including temporary connections for electricity, water, and sewage.

The consultant shall also have documented competence and experience in construction management within site and civil engineering projects and shall, as needed, be able to provide construction management resources for the execution of the above works.

The consultant will work closely with Öresundskraft's other project organization and Linde Engineering in close collaboration.

Delivery Requirements

Comprehensive, but not limited to: The consultant shall be able to deliver:

Mandatory Requirements

Documents to be included in the tender:

Scope and Location of Assignment

Start date: 2027-01-11

End date: 2028-12-22

Estimated total time for the assignment (Scope): 700 hours.

Option: Option to extend the contract for an additional 12 months. Option to increase the scope of the contract by an additional 400 hours. Options utilized in this agreement will always be at the already applicable terms.

  • Carbon Capture and Storage
  • at Filbornaverket in Helsingborg. By supplementing the combined heat and power plant with carbon dioxide capture, at least 90 percent of the carbon dioxide in the flue gases will be captured, corresponding to approximately 200,000 tons per year. The investment aims to contribute to Helsingborg's climate goals while future-proofing district heating. The project has received financial support from the EU's Innovation Fund and the Swedish Energy Agency.
  • Client support for site design
  • Design of site, stormwater, water and sewer, and underground pipes for electricity and optics
  • Construction management for groundworks contracts
  • Site design and civil engineering design.
  • Water and sewer design, including stormwater treatment.
  • Design of utility relocations for electricity and optics.
  • Preparation of construction documents and tender documents.
  • Construction management and contract follow-up.
  • Coordination between site, water and sewer, electricity, and process plants in industrial environments.
  • Experience working within the Filborna waste management area for NSR is a merit, as areas for contractors will be provided by NSR.
  • Experience working on complex industrial projects is a merit.
  • Technical investigations and alternative studies.
  • Review and assessment documents for proposed infrastructure relocations.
  • Preliminary and detailed design.
  • Construction documents, including drawings, models, and technical descriptions.
  • Support in tendering for contracts.
  • Construction management and technical support during the execution phase.
  • The main consultant must have at least 8 years of relevant experience in stormwater and water and sewer design.
  • At least 5 years of relevant experience in construction management within civil engineering (hardened surfaces, stormwater, water and sewer). If the main consultant does not meet this, another consultant who meets the requirement can be offered in the team.
  • Good proficiency in English and Swedish, both spoken and written.
  • CV
  • Hourly rate
  • Availability
  • Reference projects (Attached to tender)
  • Organizational chart for offered consultants
  • current at team delivery (Attached to tender)
  • Any confidentiality request (Attached to tender)

Project details

The consultant is expected to participate in meetings and collaborate well with the rest of the project organization. The need to be on-site at the construction site varies during the project. On average, work will be conducted on-site at Filbornaverket 1 day per week, with periods requiring more presence.

Remuneration: Remuneration will be based on a variable fee (hourly rate against budget).

The hourly rate may be index-adjusted. The hourly rate may be index-adjusted once per year according to index K21 with the contract month as the base month.

Invoicing Information: PayExpress is standard for all our contracts. See information below. Otherwise, 30 days payment term + 1-5 days for administration applies.

Last day for tender: 2026-11-24 at 23:59

Submitted tenders will be evaluated based on the following parameters:

Questions and answers (to be filled in below as they arise):

  • Competence / experience
  • weighting: 25%
  • Reference projects
  • Price
  • (total price based on hourly rate and 600 h plus travel and accommodation for travel to Filbornaverket one day on 30 occasions)
  • Interview
  • Start: 2026-12-14
  • Remote: onsite
  • Location: Helsingborg, Sweden, SE
  • Languages: Swedish, English

Indexed by 9am's meta-search. You are a job provider? Claim or manage this listing

Found on app.verama.com

  1. Job boardNew

    Senior Solution Architect

    Ework Group Sweden· Solna, Sweden· On-site· SENIOR

    • Customer Lifecycle Management
    • Customer MDM
    • KYC Assessment
    • +5

  2. Job boardNew

    Industrial Engineer

    Ework Group Sweden· Södertälje, Sweden· On-site· SENIOR

    • Assembly Process Development
    • Manufacturing Processes
    • Production Engineering
    • +8

Browse all jobs
Sign up free to apply